Septic Tanks

Septic Tank Installation

What a new septic tank installation involves, from site assessment and percolation testing through to sign-off, and what it typically costs.

Updated 1 August 2026 7 min read

In short: a new septic tank installation is driven by ground conditions as much as the tank itself. A percolation test tells the specialist how well your soil absorbs water, which determines the size and design of the drainage field the tank discharges to — and that, more than the tank itself, is usually what governs cost and feasibility.

When you need a new installation rather than a replacement

  • A new build or extension with no existing connection to mains drainage
  • A property being converted from another use (barn conversions are a common example)
  • A holiday let or annexe being added to a property already on a septic tank
  • Land being developed where mains sewer connection isn’t available or is prohibitively expensive

The installation process, step by step

  1. Site assessment — access, water table depth, proximity to boundaries, watercourses and water sources.
  2. Percolation test — required before designing a drainage field; see our percolation test guide.
  3. Design — tank size and drainage field area are calculated from occupancy and soil performance, following BS 6297.
  4. Permissions — Building Regulations approval is required; an Environment Agency permit may be needed if discharge isn’t to a drainage field.
  5. Installation — excavation, tank placement, drainage field construction and connection, typically 2–5 days depending on scale.
  6. Sign-off — building control sign-off and, where applicable, confirmation the discharge meets general binding rules.

What affects the cost

  • Ground conditions — clay soils that drain poorly often need a larger, more expensive drainage field, or push the design toward a treatment plant instead.
  • Access — tight or long access routes for excavators add time and cost.
  • Occupancy — tank and drainage field sizing scale with bedrooms/expected usage.
  • Discharge point — discharging to a drainage field under general binding rules is usually simpler and cheaper than needing an Environment Agency permit for discharge to a watercourse.

See our septic tank cost guide for indicative figures. Always get a site-specific quote — ground conditions vary too much for a generic number to be reliable.

New build and off-mains drainage

If you’re planning private drainage for a new build, see our related guidance on private drainage for new builds and off-mains drainage more broadly.

Do I always need a percolation test? +

If your septic tank will discharge to a drainage field (the normal arrangement), yes — it determines the field's size and design under BS 6297. It's not required if you're installing a sewage treatment plant discharging under a permit or exemption to a watercourse.

How long does a new septic tank installation take? +

A straightforward domestic installation typically takes 2–5 days on site, though this depends on ground conditions, drainage field size and access.

Can I install a septic tank myself? +

Building Regulations require the installation to meet defined standards and be signed off, and incorrect design can lead to expensive failures or non-compliance. Most homeowners use a specialist for design and installation even if comfortable with the groundwork itself.

Sources

  • Environment Agency — General binding rules: small sewage discharges to the environment
  • British Standard BS 6297 — Code of practice for the design and installation of drainage fields