New Build & Design

Private Drainage for New Builds

What to plan for when a new build or conversion won't connect to the mains sewer, from site assessment through to building control sign-off.

Updated 1 August 2026 6 min read

In short: if a new build, extension or conversion won’t connect to the mains sewer, private drainage needs to be designed in early — ground conditions determine what’s feasible long before foundations go in, and getting this wrong is expensive to unpick later.

Why this needs early planning

Unlike retrofitting a system to an existing property, a new build gives you the chance to design the drainage system into the site plan from the outset — but only if it’s considered early. Percolation results, drainage field space and access all affect where a building can realistically sit, not just where the tank goes.

What’s involved

  1. Site assessment and percolation test — establishes what the ground can support. See our percolation test guide.
  2. System choice — a septic tank with drainage field, or a sewage treatment plant, depending on space and discharge options. See septic tank vs sewage treatment plant.
  3. Design against BS 6297 — sizing based on the number of bedrooms/occupants the finished building will have.
  4. Building Regulations and environmental permissions — approval is required before the system is used, and a permit may be needed depending on the discharge point.
  5. Installation, typically alongside groundworks — sequencing this with the wider build programme avoids delays.

Common new-build scenarios

  • Barn and agricultural building conversions — often no existing drainage connection at all
  • Self-build homes on rural plots — private drainage is frequently the deciding factor in site feasibility
  • Small developments — may need a larger, shared system designed to serve multiple units
  • Holiday accommodation — needs sizing for peak, not average, occupancy
Can I get planning permission before confirming private drainage is feasible? +

It's possible, but risky — some local authorities and lenders want evidence drainage is workable before committing, and discovering it isn't after purchase can be costly.

Does a new build need a bigger system than an equivalent existing home? +

Sizing is based on occupancy (bedrooms), not whether the building is new — but new builds sometimes have higher water-use fixtures, worth factoring into the design.

Who signs off a new private drainage system? +

Building control sign-off is required, and depending on the discharge point, the Environment Agency (or equivalent body in Scotland, Wales and Northern Ireland) may also be involved.

Sources

  • British Standard BS 6297 — Code of practice for the design and installation of drainage fields
  • Environment Agency — General binding rules: small sewage discharges to the environment