New Build & Design

Private Drainage System Design

How private drainage systems get designed and sized, and what developers, self-builders and architects need to plan for.

Updated 1 August 2026 6 min read

In short: private drainage system design starts with the ground, not the tank — a percolation test and site assessment determine what’s actually feasible, and that should happen before a site layout or building position is finalised, not after.

Who this matters most to

  • Developers planning multiple units without a mains sewer connection
  • Self-builders on rural plots
  • Architects specifying drainage for a rural or off-grid project
  • Landowners assessing a plot’s development potential

The design process, step by step

  1. Site assessment — ground conditions, water table, access, and proximity to watercourses and boundaries.
  2. Percolation test — establishes how well the ground can support a drainage field. See our percolation test guide.
  3. System selection — septic tank with drainage field, sewage treatment plant, or (rarely, for constrained sites) a cesspit. See septic tank vs sewage treatment plant.
  4. Sizing — calculated from population equivalent (expected occupancy), following BS 6297 and British Water’s Code of Practice.
  5. Regulatory route — confirming whether the design falls under the General Binding Rules or needs an Environment Agency permit.
  6. Documentation — drainage design forms part of the Building Regulations submission.

Designing for multiple units or shared systems

Developments serving several properties often use a single, larger shared system rather than individual tanks per plot — this changes the sizing calculation, the regulatory route (larger discharges may fall outside the General Binding Rules), and typically requires more detailed design input than a single dwelling.

Common design mistakes worth avoiding

  • Fixing the building or site layout before confirming ground conditions support the intended drainage approach
  • Undersizing for future occupancy (extensions, converted outbuildings, holiday letting)
  • Assuming a drainage field will work without a percolation test
  • Overlooking access requirements for future emptying or servicing
Should I get a percolation test before or after buying land? +

Ideally before, or as a condition of purchase — discovering the ground can't support a drainage field after completion can be a costly surprise.

Does every unit in a small development need its own septic tank? +

Not necessarily — a single, appropriately sized shared system is often more practical and cost-effective than multiple individual tanks, subject to design and regulatory requirements.

Who signs off a private drainage design? +

Building control sign-off is required, and depending on the discharge point, the Environment Agency (or equivalent body outside England) may also need to be involved.

Sources

  • British Standard BS 6297 — Code of practice for the design and installation of drainage fields
  • British Water — Code of Practice: Septic tanks and treatment plants