Rules & Regulations
General Binding Rules Explained
What the General Binding Rules actually require for septic tanks and treatment plants, in plain English.
In short: the General Binding Rules (GBR) are a set of conditions, in force in England since 1 January 2015, that let most small septic tank and treatment plant discharges operate without an individual permit — provided they meet specific conditions. Meet the conditions and you’re covered automatically; fall outside them and you typically need a permit or a system change.
What counts as a “small sewage discharge”
The GBR apply to discharges that don’t go through a public sewage treatment works and stay within a daily volume limit: 2 cubic metres (2,000 litres) a day for a discharge to the ground, such as a drainage field, or 5 cubic metres (5,000 litres) a day for a discharge to surface water from a treatment plant. A typical household is well within both, so this covers most domestic septic tanks and treatment plants.
The core conditions
To be covered by the GBR without a permit, your system generally needs to:
- Discharge to a drainage field (for septic tanks) rather than directly to surface water, or discharge suitably treated effluent (for treatment plants) that meets the relevant standard
- Be located an appropriate distance from watercourses, wells, boreholes and property boundaries
- Not be within a groundwater Source Protection Zone 1 (a discharge to ground there needs a permit), or within 50 metres of a well or spring used for drinking water
- Not be within 30 metres of a public foul sewer you could reasonably connect to (for a single home, measured from any boundary of the property)
- Use a system that meets the relevant British Standard (BS EN 12566 for tanks and treatment plants, BS 6297:2007 for drainage fields), unless it was installed before 1983
- Be emptied at least once a year, or as the manufacturer advises, be properly maintained and not cause pollution
Update in July 2026: engineered ground
On 23 July 2026 the Environment Agency updated its guidance on discharges to the ground. Where the natural soil drains too quickly for a drainage field, the ground can now be engineered to slow the rate water soaks through it, and a discharge to that engineered ground can meet the GBR as long as:
- it isn’t in a floodplain
- the engineered ground has a percolation value (Vp) of at least 15
- it’s located, designed and built in line with all the other recommendations in BS 6297:2007
This helps sites on very free-draining ground, such as sand or gravel. A percolation test is how the Vp is measured.
GOV.UK has also dropped the old “Rule 1” to “Rule 9” numbering from these pages, so the rules now appear as plain headings. If an older survey or report refers to a rule by number, the content of the rules is what counts.
The most common way people fall outside the GBR
By far the most common issue is a septic tank (not a treatment plant) discharging directly to a ditch, stream or other watercourse — septic tanks don’t treat effluent thoroughly enough for this to generally be permitted. See our dedicated guide: septic tank discharging to a ditch.
What happens if you don’t meet the conditions
You’ll typically need to either bring the system into compliance (adding a drainage field, or upgrading to a treatment plant) or apply to the Environment Agency for an individual permit. See non-compliant septic tank for what this looks like in practice.
Do the General Binding Rules apply everywhere in the UK?
No — they’re specific to England. Scotland (via SEPA), Wales (via Natural Resources Wales) and Northern Ireland (via NIEA) have their own, broadly similar but not identical, regulatory frameworks.
Do I need to apply for anything if my system meets the General Binding Rules? + −
No — that's the point of the GBR. If your system meets the conditions, you're covered automatically without needing to register or apply for a permit.
How do I know if I'm in a groundwater Source Protection Zone? + −
The Environment Agency publishes maps of Source Protection Zones, and a specialist survey can confirm this as part of assessing your system.
When did the General Binding Rules come in? + −
They came into force on 1 January 2015. Septic tanks discharging directly to surface water were originally given until 1 January 2020 to be replaced or upgraded, which is why 2020 is often quoted; any still doing so should be fixed as soon as possible. Extra conditions for new discharges were added on 2 October 2023, and the guidance on engineered ground was added on 23 July 2026.